A plan is only as current as the actuals beside it. The Anaplan connector, now in early access, is designed to push Rivane actuals into your plans, so the budget vs. actual view your planners look at would reflect the ledger as it stands, not a file exported last week.
- FP&A and planning connectors in the catalog
- 4
- connectors in the Rivane integration catalog
- 31
- status of the Anaplan connector
- Early access
Actuals from a ledger that is always current
Rivane’s general ledger posts, validates and reconciles continuously, with no batch windows. That would make the actuals pushed to Anaplan as current as the books, with entity, department and class dimensions intact.
- Actuals out. Rivane actuals designed to be pushed to Anaplan plans.
- Dimensions kept. Entity, department, class and custom dimensions would travel with the numbers.
- Live variance. Budget vs. actual would update as entries post.


- Close, then export
- Reload into the planning model
- Variance a month old
- Actuals pushed from the ledger
- Dimensions preserved
- Variance current
Background
At Opal, Jemma Ewin ran annual budgeting for a A$10B sales budget and rebuilt annual, 2, 3, 5 and 10-year plans during the Orora divestiture. Planning on stale actuals is a problem she knows from the inside.
Early access.This capability is not generally available yet.
Further reading
Questions
Is the Anaplan integration available today?
It is in early access. Request access and the Rivane team will contact you as it rolls out.
Which way will the Anaplan connector work?
It is designed to push actuals from Rivane to your Anaplan plans for live budget vs. actual.
How current would the actuals be?
They would come from Rivane’s perpetual ledger, which posts and validates entries as they happen.
